Inclinometric measurement of terrain movement
In the vicinity of Zagorje system to control the movement of the terrain is installed. Terrain movements are a result of mining in this area in the past. System provides automatic monitoring of ground movements, and alerting via SMS in case of major movements that are much larger than normal movements of the terrain. Supervisor on the control SCADA system can monitor the actual terrain movements at individual monitoring locations and adjust the limits for warnings and alarms.
Project: | Inclinometric measurement of terrain movements |
Execution time: | Year 2001 |
Role on Project: | Project management, software for control and surveillance |
Total investment cost: | 500.000 EUR |