Kangaroo crane 1 on European Energy Terminal in Port of Koper
Kangaroo crane role is transhipment of dry bulk from ships to the coast in his bunker. From here bulk (iron ore, coal ..) is going to landfill through a system of conveyor belts. The renovation included the replacement of the machines all electrical equipment and electrical cables and installing control by the PLC computer control system.
Project: | Renovation of control for kangaroo crane 1, EET, Luka Koper |
Execution time: | Year 2000 |
Role on Project: | Project manager, software for operater control and machine control |
Total investmen cost: | 100.000 EUR |