Drainage of waste water in thermal power plant Šoštanj
Waste water reservoir collects waste water in the area of landfill and is pumping it into a closed system. Operation of the system can be manual or automatic. System is measureing water level in the reservoir and water is pumped out automaticaly.
Project: | Odvodnjavanje odpadnih vod v Termoelektrarna Šoštanj |
Execution time: | Year 2003 |
Role on Project: | System installation, control and data transfer for the supervision control system |
Total investment cost: | 20.000 EUR |