Bypass line EET, Port Koper
On the European energy terminal the unloading and loading of coal transport lines were connected, and thus created a circular transport path, that connects the output line of the transport belt T11 with the input transport belt T1.
In this way it is now possible to establish circular transportation on terminal and so return of material (tramack) on the landfill.
S to povezavo bo prav tako omogočen prenos premoga s deponije premoga na deponijo železa.
Project: | Bypass line EET, Port Koper |
Execution time: | Year 2014 |
Role on Project: | Supply of control equipment, automation software, system startup |