Oil storage reservoars control system TET

When renewing oil storage and usage control system in thermal power plant Trbovlje, we replaced the entire electrical equipment and installed PLC controled automation system. System is now operating in automatic mode. System is controlled over local operator graphical control panels and central control SCADA system.

Two main oil reservoirs with a capacity of holding 10,000 m3 ELKO and electrical control cabinet with the equipment. Schematic structure of oil storage and usage control system and SCADA computer display.

Project: Renovation of oil storage and usage control system in thermal power plant Trbovlje
Execution time: Year 2001
Role on project: Project management, software for control and monitoring
Total investment cost: 200.000 EUR

 


Oil storage reservoars control system TET

When renewing oil storage and usage control system in thermal power plant Trbovlje, we replaced the entire electrical equipment and installed PLC controled automation system. System is now operating in automatic mode. System is controlled over local operator graphical control panels and central control SCADA system.

Two main oil reservoirs with a capacity of holding 10,000 m3 ELKO and electrical control cabinet with the equipment. Schematic structure of oil storage and usage control system and SCADA computer display.

Project: Renovation of oil storage and usage control system in thermal power plant Trbovlje
Execution time: Year 2001
Role on project: Project management, software for control and monitoring
Total investment cost: 200.000 EUR